This project was located on the Intercoastal Waterway in Orange Beach, Alabama. The work for this project included six boat launches, lighted boat and car parking, six covered pavilions with picnic table seating, a grand pavilion, and more than one mile of concrete sidewalks and boardwalks throughout the pavilion and launch areas.














